Syringe ready to fill inspection
For syringes Simac has developed a whole range of inspection criteria’s to control the manufacturing process before the product gets its end-status of ready to fill.

Quality control was based on:

  1. Overall length syringe + cap

  2. Centralized placement of the cap.

  3. Needle inside the cap inspection

  4. Inside coating inspection

  5. Standard detection of glass cracks

 
Overall length syringe + cap

X-ray inspection of the needle inside the cap



Inside coating inspection

Can Simac Masic bv be of assistance to you in finding the best syringe inspection solution for your company?

CONTACT
Simac