Syringe ready to fill inspection

For syringes Simac has developed a whole range of inspection criteria’s to control the manufacturing process before the product gets its end-status of ready to fill.

Quality control was based on:

  1. Overall length syringe + cap

  2. Centralized placement of the cap.

  3. Needle inside the cap inspection

  4. Inside coating inspection

  5. Standard detection of glass cracks

 
Overall length syringe + cap

X-ray inspection of the needle inside the cap



Inside coating inspection

Simac